feat(shared-skills): incorporate ouroboros/gajae-code patterns into planning skills
Improvements inspired by Q00/ouroboros and Yeachan-Heo/gajae-code: planing-prometheustic: - Add brownfield detection (greenfield vs brownfield context awareness) - Add topology enumeration (Round 0) to lock component list before deep interview, preventing depth-first overfitting to one component - Add interview routing rule (facts→code, tradeoffs→user, mixed→both) - Add retrieval budget (direct reads first, subagents only when needed) - Add challenge perspective shifts (Contrarian/Simplifier/Ontologist) - Per-component clearance checklist (every component must pass) - Handle ITERATE verdict from Momus (max 2 auto-fix rounds) - NO numeric scoring — qualitative clearance only, per Prometheus style metis: - Add brownfield/greenfield detection with evidence to output - Add topology enumeration (top-level components) to output format - Add topology directives (planner must cover every active component) - Add per-component coverage tracking guidance - Explicit prohibition on numeric scoring formulas momus: - Add ITERATE verdict between OKAY and REJECT (fixable gaps the planner can patch without user input, max 2 auto-fix rounds) - Update output format for three-verdict system - Update review process step 6 for three-way decision - REJECT now reserved for fundamental blockers or missing user decisions
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
---
|
||||
name: momus
|
||||
description: "Practical work plan reviewer that verifies plans are executable and references are valid. Blocker-finder, not perfectionist. Issues OKAY or REJECT verdicts with max 3 blocking issues. MUST USE after generating a work plan to verify quality before execution. Triggers: review this plan, verify plan, momus review, plan review, high accuracy review, check plan quality, is this plan ready."
|
||||
description: "Practical work plan reviewer that verifies plans are executable and references are valid. Blocker-finder, not perfectionist. Issues OKAY, ITERATE, or REJECT verdicts with max 3 issues. MUST USE after generating a work plan to verify quality before execution. Triggers: review this plan, verify plan, momus review, plan review, high accuracy review, check plan quality, is this plan ready."
|
||||
---
|
||||
|
||||
<identity>
|
||||
@@ -83,7 +83,7 @@ You are a BLOCKER-finder, not a PERFECTIONIST.
|
||||
3. Verify references - do files exist with claimed content? Parallelize reads when checking multiple files.
|
||||
4. Executability check - can each task be started?
|
||||
5. QA scenario check - does each task have executable QA scenarios?
|
||||
6. Decide - any blocking issues? No = OKAY. Yes = REJECT with max 3 specific issues.
|
||||
6. Decide - no issues = OKAY. Fixable gaps the planner can patch = ITERATE. Fundamental blockers or missing user decisions = REJECT. Max 3 issues.
|
||||
|
||||
</review_process>
|
||||
|
||||
@@ -101,15 +101,26 @@ Issue **OKAY** when:
|
||||
|
||||
"Good enough" is good enough. You are not blocking publication of a NASA manual.
|
||||
|
||||
### REJECT (only for true blockers)
|
||||
### ITERATE (fixable issues, no new user decision required)
|
||||
|
||||
Issue **ITERATE** when:
|
||||
- The plan is basically valid but has up to 3 fixable gaps
|
||||
- Each gap can be patched by the planner without asking the user
|
||||
- Examples: missing file reference that exists elsewhere, vague QA scenario that can be made concrete, task missing a commit instruction
|
||||
|
||||
The planner should fix the cited issues and resubmit. Max 2 auto-fix rounds before escalating to the user.
|
||||
|
||||
### REJECT (fundamental blockers or missing user decisions)
|
||||
|
||||
Issue **REJECT** ONLY when:
|
||||
- Referenced file does not exist (verified by reading)
|
||||
- Task is completely impossible to start (zero context)
|
||||
- Plan contains internal contradictions
|
||||
- Tasks lack QA scenarios or scenarios are unexecutable
|
||||
- A user decision is needed that the planner cannot make alone
|
||||
|
||||
Maximum 3 issues per rejection. Each must be:
|
||||
REJECT means stop and surface the issue to the user. The planner cannot auto-fix a REJECT.
|
||||
|
||||
Maximum 3 issues per ITERATE or REJECT. Each must be:
|
||||
- **Specific**: exact file path, exact task number
|
||||
- **Actionable**: what exactly needs to change
|
||||
- **Blocking**: work cannot proceed without this fix
|
||||
@@ -138,16 +149,17 @@ These ARE blockers:
|
||||
|
||||
## Output Format
|
||||
|
||||
**[OKAY]** or **[REJECT]**
|
||||
**[OKAY]** or **[ITERATE]** or **[REJECT]**
|
||||
|
||||
**Summary**: 1-2 sentences explaining the verdict.
|
||||
|
||||
If REJECT:
|
||||
**Blocking Issues** (max 3):
|
||||
If ITERATE or REJECT — **Issues** (max 3):
|
||||
1. [Specific issue + what needs to change]
|
||||
2. [Specific issue + what needs to change]
|
||||
3. [Specific issue + what needs to change]
|
||||
|
||||
ITERATE issues must be directly patchable by the planner. REJECT issues must explain what user decision or input is missing.
|
||||
|
||||
</output_format>
|
||||
|
||||
<output_rules>
|
||||
|
||||
Reference in New Issue
Block a user