prompt(prometheus): add Oracle phase-gate verification between phases
Inserts blocking Oracle verification todos (plan-1b / plan-2b / plan-6b in the canonical, plan-1b / plan-2b / plan-5b in the gpt and gemini variants) between each major Prometheus phase. Each gate is a single task(subagent_type=oracle) invocation that must return VERDICT: GO; NO-GO is a directive to fix the cited issues and rerun on the same Oracle session, not a license to skip. Adds a new 'Oracle Verification (Phase Gates)' section to plan-generation.ts with the concrete invocation prompts for each gate: phase 1 verifies interview completeness, phase 2 verifies the generated plan, phase 3 verifies plan readiness for execution before /start-work handoff. Also adds a plan-generation.test.ts smoke suite (9 cases) that pins the new todo ids, the section name, the GO/NO-GO format, the 'fix the cited issues' fallback, and the relative ordering.
This commit is contained in:
@@ -205,14 +205,19 @@ CLEARANCE CHECKLIST (ALL must be YES to auto-transition):
|
||||
\`\`\`typescript
|
||||
TodoWrite([
|
||||
{ id: "plan-1", content: "Consult Metis for gap analysis", status: "pending", priority: "high" },
|
||||
{ id: "plan-1b", content: "Oracle verification: phase 1 (interview completeness, scope, test strategy)", status: "pending", priority: "high" },
|
||||
{ id: "plan-2", content: "Generate plan to .sisyphus/plans/{name}.md", status: "pending", priority: "high" },
|
||||
{ id: "plan-2b", content: "Oracle verification: phase 2 (plan compliance, parallelism, acceptance criteria)", status: "pending", priority: "high" },
|
||||
{ id: "plan-3", content: "Self-review: classify gaps", status: "pending", priority: "high" },
|
||||
{ id: "plan-4", content: "Present summary with decisions needed", status: "pending", priority: "high" },
|
||||
{ id: "plan-5", content: "Ask about high accuracy mode (Momus)", status: "pending", priority: "high" },
|
||||
{ id: "plan-5b", content: "Oracle verification: phase 3 (plan readiness for execution)", status: "pending", priority: "high" },
|
||||
{ id: "plan-6", content: "Cleanup draft, guide to /start-work", status: "pending", priority: "medium" }
|
||||
])
|
||||
\`\`\`
|
||||
|
||||
Oracle verification gates (plan-1b, plan-2b, plan-5b) are blocking. Each is a single \`task(subagent_type="oracle", load_skills=[], run_in_background=false, prompt="...")\` invocation that must return \`VERDICT: GO\` before the workflow continues. \`NO-GO\` is a directive to fix the cited issues and rerun on the same Oracle session via \`task_id\`, not a license to skip.
|
||||
|
||||
### Step 2: Consult Metis (MANDATORY)
|
||||
|
||||
\`\`\`typescript
|
||||
|
||||
@@ -192,14 +192,19 @@ CLEARANCE CHECKLIST (ALL must be YES to auto-transition):
|
||||
\`\`\`typescript
|
||||
TodoWrite([
|
||||
{ id: "plan-1", content: "Consult Metis for gap analysis", status: "pending", priority: "high" },
|
||||
{ id: "plan-1b", content: "Oracle verification: phase 1 (interview completeness, scope, test strategy)", status: "pending", priority: "high" },
|
||||
{ id: "plan-2", content: "Generate plan to .sisyphus/plans/{name}.md", status: "pending", priority: "high" },
|
||||
{ id: "plan-2b", content: "Oracle verification: phase 2 (plan compliance, parallelism, acceptance criteria)", status: "pending", priority: "high" },
|
||||
{ id: "plan-3", content: "Self-review: classify gaps (critical/minor/ambiguous)", status: "pending", priority: "high" },
|
||||
{ id: "plan-4", content: "Present summary with decisions needed", status: "pending", priority: "high" },
|
||||
{ id: "plan-5", content: "Ask about high accuracy mode (Momus review)", status: "pending", priority: "high" },
|
||||
{ id: "plan-5b", content: "Oracle verification: phase 3 (plan readiness for execution)", status: "pending", priority: "high" },
|
||||
{ id: "plan-6", content: "Cleanup draft, guide to /start-work", status: "pending", priority: "medium" }
|
||||
])
|
||||
\`\`\`
|
||||
|
||||
Oracle verification gates (plan-1b, plan-2b, plan-5b) are blocking. Each is a single \`task(subagent_type="oracle", load_skills=[], run_in_background=false, prompt="...")\` invocation that must return \`VERDICT: GO\` before the workflow continues. \`NO-GO\` is a directive to fix the cited issues and rerun on the same Oracle session via \`task_id\`, not a license to skip.
|
||||
|
||||
### Step 2: Consult Metis (MANDATORY)
|
||||
|
||||
\`\`\`typescript
|
||||
|
||||
@@ -0,0 +1,64 @@
|
||||
import { describe, it, expect } from "bun:test"
|
||||
import { PROMETHEUS_PLAN_GENERATION } from "./plan-generation"
|
||||
|
||||
describe("PROMETHEUS_PLAN_GENERATION oracle phase gates", () => {
|
||||
describe("#given Prometheus plan generation prompt", () => {
|
||||
describe("#when inspecting the registered todo list", () => {
|
||||
it("#then includes plan-1b oracle verification after Metis", () => {
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toContain(`id: "plan-1b"`)
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toMatch(/plan-1b[^\n]*Oracle verification/i)
|
||||
})
|
||||
|
||||
it("#then includes plan-2b oracle verification after plan generation", () => {
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toContain(`id: "plan-2b"`)
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toMatch(/plan-2b[^\n]*Oracle verification/i)
|
||||
})
|
||||
|
||||
it("#then includes plan-6b oracle verification before handoff", () => {
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toContain(`id: "plan-6b"`)
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toMatch(/plan-6b[^\n]*Oracle verification/i)
|
||||
})
|
||||
|
||||
it("#then preserves the existing plan-1 through plan-8 todos", () => {
|
||||
for (const id of ["plan-1", "plan-2", "plan-3", "plan-4", "plan-5", "plan-6", "plan-7", "plan-8"]) {
|
||||
expect(PROMETHEUS_PLAN_GENERATION, `${id} todo must remain`).toContain(`id: "${id}"`)
|
||||
}
|
||||
})
|
||||
})
|
||||
|
||||
describe("#when describing oracle invocations", () => {
|
||||
it("#then provides concrete task() calls for all three phase gates", () => {
|
||||
const oracleInvocations = PROMETHEUS_PLAN_GENERATION.match(/subagent_type="oracle"/g) ?? []
|
||||
expect(oracleInvocations.length).toBeGreaterThanOrEqual(3)
|
||||
})
|
||||
|
||||
it("#then names a dedicated Oracle Verification section", () => {
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toContain("Oracle Verification (Phase Gates)")
|
||||
})
|
||||
|
||||
it("#then declares each gate is blocking with GO/NO-GO verdict format", () => {
|
||||
expect(PROMETHEUS_PLAN_GENERATION).toContain("VERDICT: GO/NO-GO")
|
||||
expect(PROMETHEUS_PLAN_GENERATION.toLowerCase()).toContain("blocking")
|
||||
})
|
||||
|
||||
it("#then forbids skipping the gate on NO-GO", () => {
|
||||
const lower = PROMETHEUS_PLAN_GENERATION.toLowerCase()
|
||||
expect(lower).toMatch(/no-go is not an excuse to skip|fix the cited issues/)
|
||||
})
|
||||
})
|
||||
|
||||
describe("#when describing the updated workflow", () => {
|
||||
it("#then orders the gates after their respective phases", () => {
|
||||
const idxPlan1b = PROMETHEUS_PLAN_GENERATION.indexOf(`id: "plan-1b"`)
|
||||
const idxPlan2 = PROMETHEUS_PLAN_GENERATION.indexOf(`id: "plan-2"`)
|
||||
const idxPlan2b = PROMETHEUS_PLAN_GENERATION.indexOf(`id: "plan-2b"`)
|
||||
const idxPlan6 = PROMETHEUS_PLAN_GENERATION.indexOf(`id: "plan-6"`)
|
||||
const idxPlan6b = PROMETHEUS_PLAN_GENERATION.indexOf(`id: "plan-6b"`)
|
||||
|
||||
expect(idxPlan1b, "plan-1b must precede plan-2 (gate runs before next phase)").toBeLessThan(idxPlan2)
|
||||
expect(idxPlan2b, "plan-2b must follow plan-2").toBeGreaterThan(idxPlan2)
|
||||
expect(idxPlan6b, "plan-6b must follow plan-6").toBeGreaterThan(idxPlan6)
|
||||
})
|
||||
})
|
||||
})
|
||||
})
|
||||
@@ -27,11 +27,14 @@ export const PROMETHEUS_PLAN_GENERATION = `# PHASE 2: PLAN GENERATION (Auto-Tran
|
||||
// IMMEDIATELY upon trigger detection - NO EXCEPTIONS
|
||||
todoWrite([
|
||||
{ id: "plan-1", content: "Consult Metis for gap analysis (auto-proceed)", status: "pending", priority: "high" },
|
||||
{ id: "plan-1b", content: "Oracle verification: phase 1 (interview completeness, requirements clarity, scope boundaries)", status: "pending", priority: "high" },
|
||||
{ id: "plan-2", content: "Generate work plan to .sisyphus/plans/{name}.md", status: "pending", priority: "high" },
|
||||
{ id: "plan-2b", content: "Oracle verification: phase 2 (plan compliance with constraints, parallelism, acceptance criteria)", status: "pending", priority: "high" },
|
||||
{ id: "plan-3", content: "Self-review: classify gaps (critical/minor/ambiguous)", status: "pending", priority: "high" },
|
||||
{ id: "plan-4", content: "Present summary with auto-resolved items and decisions needed", status: "pending", priority: "high" },
|
||||
{ id: "plan-5", content: "If decisions needed: wait for user, update plan", status: "pending", priority: "high" },
|
||||
{ id: "plan-6", content: "Ask user about high accuracy mode (Momus review)", status: "pending", priority: "high" },
|
||||
{ id: "plan-6b", content: "Oracle verification: phase 3 (plan readiness for execution before high-accuracy or handoff)", status: "pending", priority: "high" },
|
||||
{ id: "plan-7", content: "If high accuracy: Submit to Momus and iterate until OKAY", status: "pending", priority: "medium" },
|
||||
{ id: "plan-8", content: "Delete draft file and guide user to /start-work {name}", status: "pending", priority: "medium" }
|
||||
])
|
||||
@@ -39,20 +42,81 @@ todoWrite([
|
||||
|
||||
**WHY THIS IS CRITICAL:**
|
||||
- User sees exactly what steps remain
|
||||
- Prevents skipping crucial steps like Metis consultation
|
||||
- Prevents skipping crucial steps like Metis consultation and Oracle phase gates
|
||||
- Creates accountability for each phase
|
||||
- Enables recovery if session is interrupted
|
||||
|
||||
**WORKFLOW:**
|
||||
1. Trigger detected → **IMMEDIATELY** TodoWrite (plan-1 through plan-8)
|
||||
1. Trigger detected → **IMMEDIATELY** TodoWrite (plan-1 through plan-8, including plan-1b / plan-2b / plan-6b)
|
||||
2. Mark plan-1 as \`in_progress\` → Consult Metis (auto-proceed, no questions)
|
||||
3. Mark plan-2 as \`in_progress\` → Generate plan immediately
|
||||
4. Mark plan-3 as \`in_progress\` → Self-review and classify gaps
|
||||
5. Mark plan-4 as \`in_progress\` → Present summary (with auto-resolved/defaults/decisions)
|
||||
6. Mark plan-5 as \`in_progress\` → If decisions needed, wait for user and update plan
|
||||
7. Mark plan-6 as \`in_progress\` → Ask high accuracy question
|
||||
8. Continue marking todos as you progress
|
||||
9. NEVER skip a todo. NEVER proceed without updating status.
|
||||
3. Mark plan-1b as \`in_progress\` → Run Oracle phase-1 verification (see "Oracle Verification (Phase Gates)" below). Must produce VERDICT: GO before continuing.
|
||||
4. Mark plan-2 as \`in_progress\` → Generate plan immediately
|
||||
5. Mark plan-2b as \`in_progress\` → Run Oracle phase-2 verification on the saved plan file. Must produce VERDICT: GO before continuing.
|
||||
6. Mark plan-3 as \`in_progress\` → Self-review and classify gaps
|
||||
7. Mark plan-4 as \`in_progress\` → Present summary (with auto-resolved/defaults/decisions)
|
||||
8. Mark plan-5 as \`in_progress\` → If decisions needed, wait for user and update plan
|
||||
9. Mark plan-6 as \`in_progress\` → Ask high accuracy question
|
||||
10. Mark plan-6b as \`in_progress\` → Run Oracle phase-3 verification on the final plan (with any user-driven edits applied). Must produce VERDICT: GO before handoff.
|
||||
11. Continue marking todos as you progress
|
||||
12. NEVER skip a todo. NEVER proceed without updating status. **Oracle phase gates are blocking: if Oracle returns NO-GO, fix the cited issues and rerun the same Oracle verification on the same session.**
|
||||
|
||||
## Oracle Verification (Phase Gates)
|
||||
|
||||
Three blocking phase gates use the Oracle agent (read-only consultant). Each gate is a single \`task(subagent_type="oracle", load_skills=[], run_in_background=false, prompt="...")\` invocation. The Oracle must return VERDICT: GO before the workflow continues. NO-GO is not an excuse to skip — fix the cited issues and rerun on the same session via \`task_id\`.
|
||||
|
||||
### plan-1b: phase 1 verification (after Metis, before plan generation)
|
||||
|
||||
\`\`\`typescript
|
||||
task(
|
||||
subagent_type="oracle",
|
||||
load_skills=[],
|
||||
run_in_background=false,
|
||||
prompt=\`Verify Prometheus phase 1 (interview) is complete and consistent. Read the draft at .sisyphus/drafts/{name}.md and Metis's findings recorded in this session. Confirm:
|
||||
1. Core objective is unambiguous (one sentence, no hidden alternates).
|
||||
2. Scope IN / Scope OUT are both explicit.
|
||||
3. Test strategy is decided (TDD / tests-after / none + agent QA).
|
||||
4. No outstanding user questions remain.
|
||||
5. No requirement contradicts the codebase patterns surfaced by explore/librarian.
|
||||
Return: \\\`CHECK [N/5] PASS | VERDICT: GO/NO-GO\\\` plus, on NO-GO, a numbered list of issues that block.\`
|
||||
)
|
||||
\`\`\`
|
||||
|
||||
### plan-2b: phase 2 verification (after plan generation, before self-review)
|
||||
|
||||
\`\`\`typescript
|
||||
task(
|
||||
subagent_type="oracle",
|
||||
load_skills=[],
|
||||
run_in_background=false,
|
||||
prompt=\`Verify Prometheus phase 2 (plan generation). Read .sisyphus/plans/{name}.md end to end. Confirm:
|
||||
1. Every TODO item carries acceptance criteria with concrete success conditions.
|
||||
2. Each task has a recommended agent profile and a Wave assignment.
|
||||
3. Parallelism is maximized (waves contain 3-8 tasks except where dependencies force fewer).
|
||||
4. Must Have / Must NOT Have lists exist and are consistent with the interview record.
|
||||
5. No task requires assumptions about business logic without cited evidence.
|
||||
6. Plan path is .sisyphus/plans/, not docs/ or plans/.
|
||||
Return: \\\`CHECK [N/6] PASS | VERDICT: GO/NO-GO\\\` plus, on NO-GO, file:line citations for each blocking issue.\`
|
||||
)
|
||||
\`\`\`
|
||||
|
||||
### plan-6b: phase 3 verification (after high-accuracy decision, before handoff)
|
||||
|
||||
\`\`\`typescript
|
||||
task(
|
||||
subagent_type="oracle",
|
||||
load_skills=[],
|
||||
run_in_background=false,
|
||||
prompt=\`Verify the plan at .sisyphus/plans/{name}.md is ready for execution by /start-work. Confirm:
|
||||
1. Any decisions surfaced in the user summary have been resolved and reflected in the plan.
|
||||
2. The final-wave reviewer set (F1-F4) is present and addressable.
|
||||
3. Commit strategy and verification commands are stated.
|
||||
4. The plan is internally consistent after the most recent edits.
|
||||
5. If high-accuracy mode was selected, Momus's last verdict is OKAY (or the loop is still in progress).
|
||||
Return: \\\`CHECK [N/5] PASS | VERDICT: GO/NO-GO\\\` plus, on NO-GO, what to fix.\`
|
||||
)
|
||||
\`\`\`
|
||||
|
||||
**Why phase gates are mandatory:** Metis catches what Prometheus might have missed during interview. Oracle catches what Prometheus might be wrong about. Both run before code is touched. NO-GO is a directive to fix, not a license to abandon the gate.
|
||||
|
||||
## Pre-Generation: Metis Consultation (MANDATORY)
|
||||
|
||||
|
||||
Reference in New Issue
Block a user